..

Revista de Sistemas Elétricos e Eletrônicos

Optimal Placement of Distributed Generation Units for Constructing Virtual Power Plant Using Binary Particle Swarm Optimization Algorithm

Abstract

Bahrami S and Imari A

The idea of applying distributed generation resources in distribution systems has become increasingly important due to changes in the distribution systems. Optimal sizing, location, type and installation time of DGs for constructing virtual power plant is one of the important subjects in applying distributed generation in the power system. In this paper, a new method is presented for optimal placement and type of distributed generation units and long term system planning aim to constructing virtual power plant. Minimizing the long term total cost of the system is considered as the objective function. The impacts of applying demand response on expansion planning is also investigated. The Binary particle Swarm Optimization (BPSO) method is used for solving this problem. In order to evaluate the efficiency of the proposed method, the method is tested on the IEEE 33 bus distribution system.

Isenção de responsabilidade: Este resumo foi traduzido usando ferramentas de inteligência artificial e ainda não foi revisado ou verificado

Compartilhe este artigo

Indexado em

Links Relacionados

arrow_upward arrow_upward